Initial commit. Lab 1.1.4
7
README.md
Normal file
@@ -0,0 +1,7 @@
|
|||||||
|
# Networking
|
||||||
|
|
||||||
|
## Lab Works
|
||||||
|
|
||||||
|
- September
|
||||||
|
- [ ] [Vocabulary](./september/vocabulary.md)
|
||||||
|
- [ ] [1.1.4 Packet Tracer - Create Realistic Structured Cabling in the Physical Workspace and Cabling Devices in a Rack](./september/lab-1.1.4.md)
|
||||||
BIN
september/assets/lab-1.1.4-1.png
Normal file
|
After Width: | Height: | Size: 841 KiB |
BIN
september/assets/lab-1.1.4-2.png
Normal file
|
After Width: | Height: | Size: 118 KiB |
BIN
september/assets/lab-1.1.4-3.png
Normal file
|
After Width: | Height: | Size: 1.2 MiB |
BIN
september/assets/lab-1.1.4-4.png
Normal file
|
After Width: | Height: | Size: 1.6 MiB |
BIN
september/assets/lab-1.1.4-5.png
Normal file
|
After Width: | Height: | Size: 1.1 MiB |
BIN
september/assets/lab-1.1.4-6.png
Normal file
|
After Width: | Height: | Size: 130 KiB |
BIN
september/assets/lab-1.1.4-7.png
Normal file
|
After Width: | Height: | Size: 1.1 MiB |
BIN
september/assets/lab-1.1.4-8.png
Normal file
|
After Width: | Height: | Size: 1.4 MiB |
45
september/lab-1.1.4.md
Normal file
@@ -0,0 +1,45 @@
|
|||||||
|
# 1.1.4 Packet Tracer - Create Realistic Structured Cabling in the Physical Workspace and Cabling Devices in a Rack
|
||||||
|
|
||||||
|
## Objectives
|
||||||
|
|
||||||
|
In this activity, you will install a patch panel and a wall mount. You will then use these to connect network devices in the office to the equipment in the wiring closet.
|
||||||
|
|
||||||
|
- Part 1: Install a Patch Panel in the Wiring Closet
|
||||||
|
- Part 2: Attach a Wall Mount in the Office
|
||||||
|
- Part 3: Connect an Additional Wall Mount and Cables
|
||||||
|
|
||||||
|
## Required Resources
|
||||||
|
|
||||||
|
- Latest Packet Tracer version
|
||||||
|
|
||||||
|
## Procedure
|
||||||
|
|
||||||
|
### Part 1: Install a Patch Panel in the Wiring Closet
|
||||||
|
|
||||||
|
- Step 1: Install a patch panel in the Rack;
|
||||||
|
|
||||||
|

|
||||||
|
|
||||||
|
- Step 2: Connect the Office-SW1 to the patch panel.
|
||||||
|
|
||||||
|

|
||||||
|
|
||||||
|
### Part 2: Attach a Wall Mount in the Office
|
||||||
|
|
||||||
|
- Step 1: Install a wall mount;
|
||||||
|
|
||||||
|

|
||||||
|
|
||||||
|

|
||||||
|
|
||||||
|
- Step 2: Organize the cables.
|
||||||
|
|
||||||
|

|
||||||
|
|
||||||
|
### Part 3: Connect an Additional Wall Mount and Cables
|
||||||
|
|
||||||
|

|
||||||
|
|
||||||
|

|
||||||
|
|
||||||
|

|
||||||